Following installation procedures is key

By | Uncategorized | No Comments

Every unit we dispatch has installation instructions attached as this is the most important information we can provide for a quick and easy install. Ensuring your site is properly prepared is one of the issues we often find lacking. If a site is not properly excavated, or is an above ground unit is not placed on a flat surface, then the install can become a real problem afterwards.
We recently had a plumber install a MGTR10000 incorrectly on a sloping slab, this put uneven pressure on one side of the unit. The plumber would not accept this was the problem but as with every product, correct installation is key.
If you have any issues or questions regarding you install, please call us on 1800 626 753 or email

Upgrading Rainbow Beach with the MGTS™

By | Uncategorized | No Comments

Rainbow Beach CBD upgrade

NCP are installing an MGTS™5000 today as part of the Rainbow Beach CBD  upgrades as part of the Our Towns program.

Bruce, the lead plumber at NCP, said he loves putting in our tanks and won’t use anything else!

This project will include a couple of cafes and a new fish and chips place. It is the first commercial work this tourist hot spot has seen in over a year.

View our range of products and download our latest catalogue